Home
Full Throttle
Garage
Images
Links
Paint Shop
Pit Lane
Reviews
Videos
    --CATEGORY--
General Information
General Electric
General Nitro
HPI Savage
Losi LST
Sportwerks Mayhem
Traxxas E. Rustler
Traxxas E. Stampede
Traxxas N. Rustler
Traxxas N. Stampede
Traxxas E-Maxx
Traxxas T-Maxx
Traxxas Revo


      --ARTICLE--
Ball Joints
Brake Upgrades
Bumper Adjustment
Cut Wheels/Tires
Exploded Views
Forward Conversion
Frequency Access
Installing a Failsafe
Metal-Gear Servos
MIP CVD's
Motor Head Swap
Motor Swap
Pullstart Conversion
Receiver Pack
Rerouting Fuel Line
RPM Arms
Servo Savers/Horns
Shocks
Shock Mounts
Slipper Clutch
Slipper Pegs
Spare Screws
Spur Gap
Steel Spur
Steering Bellcrank
Throttle Bellcrank
Throttle Return Spring
Upgrades
Work Stand

MIP CVD's (Constant Velocity Drives)

Installation


At first assembling CVD's and installing them on your T-Maxx. can seem a little intimidating. However as you'll soon see by reading this walkthrough, it's very simple.

The first thing you need to do is to place a thin coating of MIP lube on the coupling that fits inside the axle.




Once the coupling has been lubed insert it into the axle.




Now you need to put some MIP lube in the cup end of the dogbone and place the dogbone over the axle end. Next slide the cross pin through the hole in one side of the dogbone and through the hole in the coupling, Finish by pushing the pin into the hole on the opposite side of the dogbone. Once completed the pin should be flush with the dogbone. The picture below shows the pin halfway inserted into the dogbone and coupling.




Then, using the small grub screw and a .050 hex wrench, secure the cross pin by tightening the grub screw into the side of the coupling. Note that the grub screw will only screw into one side of the coupling. I would also suggest you use a small drop of lock-tite on the set screw.




To prevent problems with the cross pin becoming loose, as explained on the first page of this article, I would suggest the use of shrink tubing around the dogbone to axle joint. So slide a small section of tubing over the joint...




...and then heat it with a lighter until it shrinks to fit the joint. Once that's complete you can trim the excess shrink tubing away so that it doesn't interfere with the flexibility of the joint itself. You can also use these CVD Bulletproofing Methods to help decrease the chances of the cross pin coming loose even more.




When installing the axle into the bearing/bushing carrier it's important to realize the proper order in which you should install the washers and bearings. I have found that the Electric Stampede works best with just one washer used on the outside of the bearing carrier, between the bearing and the hex nut and pin. The picture below shows the order in which I install my bearing carrier components. Other applications may vary.




Installing the included MIP output yoke is self explanatory. It simply replaces the stock plastic yoke. However make sure you use lock-tite on the grub screws that secure the new output yoke. Below is a picture of one CVD assembly installed on an Electric Stampede. Remember to allow all the lock-tite to fully cure before using the CVD's. Otherwise you may run into a problem with a grub screw backing out. Consult your lock-tite tube for recommended curing times.




If you need a diagram of the CVD assembly, MIP offers an online copy of their instruction sheet.


Part One:   Potential Sources Of Problems
Part Two:   Installation


misbehavin-rc.com © 2002-2008